CSIR Central

Life-cycle cost analysis of a concrete road bridge across open sea

IR@CECRI: CSIR-Central Electrochemical Research Institute, Karaikudi

View Archive Info
 
 
Field Value
 
Title Life-cycle cost analysis of a concrete road bridge across open sea
 
Creator Bhaskaran, R.
Palaniswamy, N.
Rengaswamy, N.S.
 
Subject Concrete corrosion
Corrosion Science and Engineering
 
Description A Life cycle cost analysis (LCCA) was made of a 2,345 m-long prestressed concrete road bridge across open sea. The bridge was completed at a cost of 34.2 million and opened to the traffic during 1988. it is subject to periodic maintenance such as painting, repair and replacement of affected parts. The LCCA used the net present value method for a 50 year design life. The annual cost of corrosion is ~$43,000. By adopting galvanic cathodic protection, the annual cost of corrosion can be brought down to ~$40,000.
 
Publisher National Association of Corrosion Engineers
 
Date 2006
 
Type Article
PeerReviewed
 
Format application/pdf
 
Identifier http://cecri.csircentral.net/773/1/097-2006.pdf
Bhaskaran, R. and Palaniswamy, N. and Rengaswamy, N.S. (2006) Life-cycle cost analysis of a concrete road bridge across open sea. Materials Performance, 45 (10). pp. 51-55. ISSN 0094-1492
 
Relation http://cecri.csircentral.net/773/