Study on Control Blasting at Metro Rail Project- A Case Study

IR@CIMFR: CSIR-Central Institute of Mining and Fuel Research, Dhanbad

View Archive Info
 
 
Field Value
 
Title Study on Control Blasting at Metro Rail Project- A Case Study
 
Creator Pingua, B.M.P
 
Subject Explosive Research
 
Description Ground vibrations due to blasting processes are one of the fundamental problems in the mining and civil excavation industry which may cause severe damage to the structures. It is mostly recommended that a detail comprehensive vibration control is required. This paper presents the results of ground induced vibration at a metro rail station excavation site in the heart-of-city of Bangalore. This study was carried out to control ground induced vibration, fly rock near to sensitive structures, mostly to the city civil court and the buildings of Sir M Visveswaraya college and like statue, school, public and private structures closed to 10-15m. More than 60 blasts were done under control supervision of government officials. The maximum charge/delay, charge per hole, delay in between holes and rows were established on basis geological rock mass. Ninety percent rock was excavated to construct underground metro stations. The fly rock was control by optimum stemming lengths and by using suitable fly control rubber mat.
 
Publisher IME Publication Bhubaneswar
 
Date 2013-08
 
Type Article
PeerReviewed
 
Identifier Pingua, B.M.P (2013) Study on Control Blasting at Metro Rail Project- A Case Study. Indian Mining & Engineering Journal , 52 (8). pp. 11-15. ISSN 0019-5944
 
Relation http://cimfr.csircentral.net/1455/