CSIR Central

Failure Investigation of Radiant Platen Superheater Tube of Thermal Power Plant Boiler

IR@CMERI: CSIR- Central Mechanical Engineering Research Institute (CMERI), Durgapur

View Archive Info
 
 
Field Value
 
Title Failure Investigation of Radiant Platen Superheater Tube of Thermal Power Plant Boiler
 
Creator Ghosh, D.
Ray, S.
Mandal, A.
Roy, H.
 
Subject Failure
 
Description This paper highlights a case study of typical premature failure of a radiant platen superheater tube of 210 MW thermal power plant boiler. Visual examination, dimensional measurement and chemical analysis, are conducted as part of the investigations. Apart from these, metallographic analysis and fractography are also conducted to ascertain the probable cause of failure. Finally it has been concluded that the premature failure of the super heater tube can be attributed to localized creep at high temperature. The corrective actions has also been suggested to avoid this type of failure in near future.
 
Date 2015-04
 
Type Article
PeerReviewed
 
Identifier Ghosh, D. and Ray, S. and Mandal, A. and Roy, H. (2015) Failure Investigation of Radiant Platen Superheater Tube of Thermal Power Plant Boiler. High Temperature Materials and Processes, 34 (2). pp. 171-175.
 
Relation http://cmeri.csircentral.net/223/