CSIR Central

Optimum Utilization of Continuous Miner for Optimization of Production in Board and Pillar Mining Method in Indian Underground Coal Mines

IR@CIMFR: CSIR-Central Institute of Mining and Fuel Research, Dhanbad

View Archive Info
 
 
Field Value
 
Title Optimum Utilization of Continuous Miner for Optimization of Production in Board and Pillar Mining Method in Indian Underground Coal Mines
 
Creator Kumar, Priyesh
Trivedi, Ratnesh
 
Subject Envieronmental Management Group
 
Description In present contest with the past, production optimization has become important goal for industries. With reference to past few decades’ underground coal mining operations uses continuous mining technology to extract coal reserves from the underground coal seams. Matching with the continuous miner shuttle cars are used to transport the coal from the face to a feeder breaker. After that, coal is generally tilted over the conveyor system in underground that transport to the surface for distribution to consumers most of power generation plant of India. The availability of coal and methods of mining plays the key role, but in this area of continuous technology, miner feels a safe and environment-friendly path for increasing the overall production. Technology suits for obtaining the target production according to Indian coal seams occurrence as per geological structures. Productivity may improve by effective management of breakdown of the using machineries. This paper is purpose to identify the various factor and problems affecting the productivity of the underground coal mine.
 
Publisher IME Publication Bhubaneswar
 
Date 2019-05
 
Type Article
PeerReviewed
 
Identifier Kumar, Priyesh and Trivedi, Ratnesh (2019) Optimum Utilization of Continuous Miner for Optimization of Production in Board and Pillar Mining Method in Indian Underground Coal Mines. Indian Mining & Engineering Journal , 58 (5-6). pp. 17-23. ISSN 0019-5944
 
Relation http://cimfr.csircentral.net/2017/