CSIR Central

Simulation and control studies for FBTR steam water system

IR@NISCAIR: CSIR-NISCAIR, New Delhi - ONLINE PERIODICALS REPOSITORY (NOPR)

View Archive Info
 
 
Field Value
 
Creator Vaidyanathan, G
 
Date 2011-10-18T10:36:20Z
2011-10-18T10:36:20Z
2011-08
 
Identifier 0975-1017 (Online); 0971-4588 (Print)
http://hdl.handle.net/123456789/12899
 
Description 321-328
Fast breeder test reactor (FBTR)<b style=""> </b>of 50 MWt, 13.2 MWe is in operation at Kalpakkam, India. It has a full fledged steam water system with addition of a dump condenser (DC) to condense all the steam in the event of non availability of turbine generator (TG). For smooth changeover from the TG operation to DC operation, a control scheme was evolved. Towards this a computer code POWDYN is developed based on a one dimensional simulation model of the steam water system. Different control schemes are analyzed with the code and final scheme arrived at. This paper presents the details of FBTR steam water system; the simulation model used for control studies and predicted response of the steam water system to different transients.
 
Language en_US
 
Publisher NISCAIR-CSIR, India
 
Rights <img src='http://nopr.niscair.res.in/image/cc-license-sml.png'> <a href='http://creativecommons.org/licenses/by-nc-nd/2.5/in' target='_blank'>CC Attribution-Noncommercial-No Derivative Works 2.5 India</a>
 
Source IJEMS Vol.18(4) [August 2011]
 
Subject Fast breeder test reactor
Dump condenser
Turbine generator
Steam water system
 
Title Simulation and control studies for FBTR steam water system
 
Type Article